BWSSB Rainwater Harvesting (RWH) Penalty on Old Houses in Bangalore

Many house owners in Bengaluru pay the BWSSB RWH penalty, an extra charge every month because BWSSB says they have not set up rainwater harvesting (RWH). For many older houses on smaller sites, the law does not require RWH at all. If that is your case, the penalty can be challenged.

What is the “Other charges” line on your BWSSB bill?

If your bill shows a large amount under “Other charges”, it is often the RWH penalty. BWSSB adds it when its records say your building should have RWH but does not. It is added every month until it is removed.

How much is the BWSSB RWH penalty?

Under Regulation 8 of the BWSSB Rain Water Harvesting Regulations, the penalty is a percentage of your water and sanitary charges:

  • Houses (residential): 50% for the first three months, then 100% every month after that.
  • Shops, offices and other non-residential buildings: 100% for the first three months, then 200%.

At 100%, the penalty equals your water and sanitary charges, so your bill roughly doubles. If your water and sanitary charges are ₹800 a month, you pay about ₹800 extra every month, or nearly ₹10,000 a year.

Who actually has to have rainwater harvesting?

The rule is in Section 72A of the BWSSB Act. It was last rewritten by the Karnataka government on 7 October 2021. It depends on your site area, not your built-up area:

  • Building a new house: RWH is needed if the site is 108 sq m (about 1,163 sq ft) or more.
  • An existing house: RWH is needed only if the site is 216 sq m (about 2,325 sq ft) or more, up to 1,000 sq m.
  • Very large sites (over 1,000 sq m): RWH and dual piping are both needed.
BWSSB RWH penalty site size chart - which Bangalore houses need rainwater harvesting

Here is how common Bengaluru site sizes work out:

Site sizeAreaExisting house (built before Oct 2021)New construction
20 x 30 ft600 sq ft (55.7 sq m)Not requiredNot required
30 x 40 ft1,200 sq ft (111.5 sq m)Not requiredRequired
30 x 50 ft1,500 sq ft (139.4 sq m)Not requiredRequired
40 x 60 ft2,400 sq ft (223 sq m)RequiredRequired
50 x 80 ft4,000 sq ft (371.6 sq m)RequiredRequired

If your house was built between 2011 and 2021 on a site of 1,200 sq ft or more, the older rule applied when it was built, so your position needs a closer look. Talk to us before you act.

BWSSB must give you a hearing first

The 2015 amendment to the regulations says the penalty cannot be added unless the owner is first given a chance to be heard. If you never received a notice or a hearing call, that is another point in your favour.

When the RWH penalty may be wrong

  • Your house is an existing house on a site below 216 sq m.
  • You already have RWH, but BWSSB has not inspected or certified it. Under Regulation 9, certification is done by BWSSB engineers or agencies the Board has approved.
  • Your connection is in the wrong category.
  • The penalty was added without any notice or hearing.

What you can do

  1. Check your site size in your site papers, such as the BDA allotment letter or sale deed.
  2. Check your BWSSB bill for the “Other charges” line.
  3. Write to the Assistant Executive Engineer of your BWSSB sub-division, asking for the penalty to be removed.
  4. If there is no action, take it to the Executive Engineer or file a complaint with BWSSB.

It sounds simple, but getting it right takes the correct rule, the correct papers and repeated follow-up at the office.

How Assistant Madhu can help

Assistant Madhu offers on-ground help across Bengaluru for BWSSB water bill problems:

  • Checking your bill and site papers to see whether the RWH rule applies to you
  • Preparing the application to BWSSB, in English or Kannada
  • Visiting your BWSSB sub-division office and following up
  • Changing the owner name on the water bill after the owner has passed away

You hire us for our time, so you pay only for the help you need. We also help with professional tax problems, lost SSLC marks cards and contractor licences.

Talk to us

Paying an RWH penalty on an older house? Send a photo of your water bill on WhatsApp to 95386 78702. We serve Bengaluru only.

Frequently asked questions

Do old houses in Bangalore have to pay the BWSSB RWH penalty?

Not always. Under Section 72A as amended in 2021, an existing house needs rainwater harvesting only if its site is 216 sq m (about 2,325 sq ft) or more. Older houses on 30×40 or 30×50 sites are below this limit.

Is the RWH rule based on site area or built-up area?

Site area. The size of your plot decides whether the rule applies, not the size of the house.

How much is the RWH penalty on a BWSSB bill?

For houses, it is 50% of the water and sanitary charges for the first three months, then 100%. For non-residential buildings, it is 100%, then 200%.

I have no space for rainwater harvesting. What can I do?

First check whether the rule applies to your site at all. If it does, compact systems using a tank or a small recharge pit are possible on many small sites.

I already have RWH but still pay the penalty. Why?

BWSSB may not have recorded it. Under Regulation 9, the system must be certified by BWSSB engineers or a Board-approved agency before the penalty stops.

Can BWSSB add the penalty without telling me?

The regulations say the penalty should not be levied unless the owner is first given a chance to be heard.

Can I get back the penalty I already paid?

You can ask for a refund or an adjustment in your application. Whether BWSSB agrees depends on your case.

Do you help outside Bengaluru?

No. Assistant Madhu currently serves Bengaluru only.

Rules this page is based on

  • Section 72A, BWSSB Act, 1964, as substituted by the Bangalore Water Supply and Sewerage (Amendment) Act, 2021 (Karnataka Act No. 29 of 2021), published 7 October 2021
  • BWSSB (Rain Water Harvesting) Regulations, 2010, notified 28 October 2010
  • Regulation 8, levy of additional water and sanitary charges, as substituted by the 2015 Amendment Regulations (notification dated 25 February 2016)
  • Penalty rates raised by the 2019 Amendment Regulations (notification dated 6 March 2020)
  • Regulation 9, certification of RWH, inserted by the 2020 Amendment Regulations (notification dated 6 May 2020)
  • Source: BWSSB, Rain Water Harvesting Amendments, Regulations and Guidelines

Note: This page explains the rules as published up to the 2021 amendment, in plain language. It is general information, not legal advice. Rules can change, so every case is checked against the current rules before we apply.

Last updated: October 2026